4. Installing Jute Netting. The installation process is critical for achieving effective erosion control: Roll Out the Netting: Start at the top of the slope, unrolling the jute downward. Lay it flat against the contours of the ground. Overlap Edges: Overlap strips of netting by 6–12 inches to prevent gaps where soil could erode. More @Wikipedia
Hover over any link to get a description of the article. Please note that search keywords are sometimes hidden within the full article and don't appear in the description or title.