Follow the steps outlined below: Surface preparation. Step 1—Sound the concrete surfaces to locate delaminated areas. This may be done as described in ASTM D4580-03(2007), “Standard Practice for Measuring Delamination in Concrete Bridge Decks by Sounding.”. Step 2—Mark the perimeter of the repair area. More @Wikipedia
Get the latest news about Construction Debris from the top news sites, aggregators and blogs. Also included are videos, photos, and websites related to Construction Debris.
Hover over any link to get a description of the article. Please note that search keywords are sometimes hidden within the full article and don't appear in the description or title.