A losing bidder says the firms selected to develop toll lanes for the Beltway and I-270 assumed “unrealistic” construction costs
Katherine Shaver, Washington Post: Local
Wed, 02/16/2022 - 4:00am
A losing bidder says the firms selected to develop toll lanes for the Beltway and I-270 assumed “unrealistic” construction costs