Construction bids came in higher than expected, and soil and bridge stabilization work costs were higher than expected.
Glenn Coin | gcoin@syracuse.com, The Post-Standard
Mon, 09/02/2013 - 2:09am
Construction bids came in higher than expected, and soil and bridge stabilization work costs were higher than expected.