The last of the concrete is being poured Wednesday to repair the I-495 bridge that was closed for weeks over the summer. 2/25/15
Wilmington - Home, The News Journal
Wed, 02/25/2015 - 10:34am
The last of the concrete is being poured Wednesday to repair the I-495 bridge that was closed for weeks over the summer. 2/25/15