The ramp on the north side of Highway 100 at Edgewood Road will be closing on Monday, weather permitting, as work continues on the Highway 100 extension.Over the summer, traffic entering and exiting Highway 100 used the north ramp to move between 100 and Edgewood, while reconstruction of the ramp on the south side of 100 occurred.