Stories Related to Drake Power Plant Fully Operational Months After Fire

BY RYAN MAYE HANDY ryanmaye.handy@gazette.com -Ten months after a fire ripped through Martin Drake Power Plant, Colorado Springs Utilities announced on Monday that the plant is fully operational after $20 million of repair work. Lubricating oil dripping on hot steam pipes ignited the fire on May 5, 2014 - the blaze heavily damaged three boilers in the plant, shutting down all operations for more than two months.

Sections:  u.s.   
RELATED ARTICLES

 

Welcome to Wopular!

Welcome to Wopular

Wopular is an online newspaper rack, giving you a summary view of the top headlines from the top news sites.

Senh Duong (Founder)
Wopular, MWB, RottenTomatoes

Subscribe to Wopular's RSS Fan Wopular on Facebook Follow Wopular on Twitter Follow Wopular on Google Plus

MoviesWithButter : Our Sister Site

More U.s. News