The bridge was closed down on March 30. Detours have been posted to route traffic to Route 73, Route 41 and Lenola Road.
Cherry Hill Courier-Post, Courier-Post
Thu, 03/30/2023 - 2:14pm
The bridge was closed down on March 30. Detours have been posted to route traffic to Route 73, Route 41 and Lenola Road.