Engineers prepare 50,000 pounds of mud and a fleet of robotic subs in first maneuver to outright stop the flow of leaking oil a mile below surface. BP - Oil well - Gulf of Mexico - Business - Energy
Joel Achenbach and Steven Mufson, Washington Post
Tue, 05/25/2010 - 8:38am
Engineers prepare 50,000 pounds of mud and a fleet of robotic subs in first maneuver to outright stop the flow of leaking oil a mile below surface. BP - Oil well - Gulf of Mexico - Business - Energy