The Zink Dam rebuild and new pedestrian bridge are slated to cost about $63 million. The south Tulsa/Jenks dam would be built just south of the Creek Turnpike. That project also would include a pedestrian bridge, plus a boat dock and connection to trails along the river — all for about $64.2 million.